LAB2PLANT
From the Laboratory to the Plant
- Customer objective
Accelerate purification
Pilot scaling without CAPEX
2-3 month reduction in timeline
- Unlock Bottlenecks
- Specific actions
Initial technical meeting and NDA
Sample reception and documentation
Definition of a work protocol
System Execution and Purification
01
Technical report signed
Full documentation of the results obtained.
02
Chromatographic data
Analytical and purification results with expert interpretation.
03
Scaling recommendations
Roadmap for scaling if needed, with the necessary steps and resources.
Real-life cases
Illustrative examples of how LAB2PLANT acts as a platform to resolve critical and scaling issues
Purification unlock
recombinant protein
SituationFarm with method Inefficient purification that blocked the Project progress.
ActionSample reception, definition of work protocol and execution thereof development and scaling of production.
ResultMethod implemented at client's site in 12 weeks. Project unblocked and schedule recovered.
Pilot purification
of an Active Ingredient
SituationCompany with no resources available for Pilot Purification of a Active Ingredient.
ActionPilot purification run for preparative HPLC with optimisation gradient and scale.
Result: Purity >98%% achieved. Sample available for pre-clinical studies in 12 weeks.
Pilot scale
without CAPEX
-
SituationStart-up that needed to scale from 10mg to 50g the purification of a Product for a toxicological study.
ActionDefinition of the scaling protocol, execution in the LAB2PLANT installation and signed technical report.
-
ResultScaling completed in 5 weeks. Estimated savings of €120,000 Own CAPEX.
Contact
Tell us your challenge
- Girona Science Park | Pic de Peguera 11, 17003 GIRONA
- jbacardit@uatane.com
- damoros@uatane.com
- +34 652 977 017