LAB2PLANT

From the Laboratory to the Plant

  • Accelerate purification

  • Pilot scaling without CAPEX

  • 2-3 month reduction in timeline

  • Unlock Bottlenecks
  • Initial technical meeting and NDA

  • Sample reception and documentation

  • Definition of a work protocol

  • System Execution and Purification

01

Technical report signed

Full documentation of the results obtained.

02

Chromatographic data

Analytical and purification results with expert interpretation.

03

Scaling recommendations

Roadmap for scaling if needed, with the necessary steps and resources.

Real-life cases

Illustrative examples of how LAB2PLANT acts as a platform to resolve critical and scaling issues

Purification unlock
recombinant protein

  • SituationFarm with method Inefficient purification that blocked the Project progress.

  • ActionSample reception, definition of work protocol and execution thereof development and scaling of production.

  • ResultMethod implemented at client's site in 12 weeks. Project unblocked and schedule recovered.

Pilot purification
of an Active Ingredient

  • SituationCompany with no resources available for Pilot Purification of a Active Ingredient.

  • ActionPilot purification run for preparative HPLC with optimisation gradient and scale.

  • Result: Purity >98%% achieved. Sample available for pre-clinical studies in 12 weeks.

Pilot scale
without CAPEX

  • SituationStart-up that needed to scale from 10mg to 50g the purification of a Product for a toxicological study.

    ActionDefinition of the scaling protocol, execution in the LAB2PLANT installation and signed technical report.

  • ResultScaling completed in 5 weeks. Estimated savings of €120,000 Own CAPEX.

Contact

Tell us your challenge